F37 Series Parallel Shaft Helical Geared Motor Manufacturer

F37 Series Parallel Shaft Helical Geared Motor Manufacturer

F collection Parellel Shaft-CZPTcal Geared Motor Traits

one. Characteristics:

  1. High performance: 92%-ninety four%
  2. Parallel output, compact construction, huge output torque, clean procedure, reduced noise and prolonged service life.
  3. Substantial precision: the equipment is produced of higher-high quality alloy metal forging, carbonitriding and hardening treatment method, grinding method to make sure large precision and steady working.
  4. Large interchangeability: extremely modular, serial design, strong versatility and interchangeability.

two. CZPT parameters

Ratio 3.seventy seven-276.seventy seven
Input electricity .12-200KW
Output torque 3.5-21700N.m
Output speed five-352rpm
Mounting sort Foot mounted, foot mounted with strong shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Input Technique Flange input(AM), shaft enter(Advert), inline AC motor enter, or AQA servo motor
Brake Release HF-manual release(lock in the brake release placement), HR-handbook release(autom-atic braking place)
Thermistor TF(Thermistor defense PTC thermisto)
TH(Thermistor defense Bimetal swotch)
Mounting Place M1, M2, M3, M4, M5, M6
Sort F37-F157
Output shaft dis. 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing materials HT200 substantial-energy cast iron from R37,47,fifty seven,67,77,87
Housing materials HT250 Substantial energy solid iron from R97 107,137,147,
157,167,187
Heat treatment technology carbonitriding and hardening treatment method
Performance ninety two%-ninety four%
Lubricant VG220
Security Course IP55, F class

CZPTshine Drive

ZheJiang CZPTshine Drive Co.,Ltd,the predecessor was a condition-owned armed forces mould organization, was set up in 1965. CZPTshine specializes in the comprehensive energy transmission answer for higher-stop gear producing industries dependent on the aim of “System Merchandise, Software Layout and Skilled Service”.
CZPTshine have a robust technological power with above 350 staff at existing, such as more than 30 engineering professionals, 30 top quality inspectors, masking an location of 80000 square meters and varieties of sophisticated processing devices and screening equipments. We have a good foundation for the market software improvement and services of substantial-conclude pace reducers & variators possessing to the provincial engineering technology study center,the lab of equipment pace reducers, and the foundation of modern R&D.

Our Group

High quality Control
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
item is a product inspection to determine the qualified products.

7. Certification.
All our items get ISO & CE & UL certification.

Packing

Shipping and delivery

 

F37 Series Parallel Shaft Helical Geared Motor Manufacturer

Tags: